New construction and tenant-improvement openings
Before frame installation, confirm the opening number, approved schedule and submittal, wall type and thickness, rough opening, frame size and handing, anchors, hardware preparations, finished-floor elevation, threshold, and nearby trade conflicts.
Before hanging the door, verify the delivered leaf and frame preparations, hinge or pivot locations, lock or exit-device function, closer and stop coordination, seals, thresholds, and any electrified interface.
- Opening number
- Handing and swing
- Wall and anchor condition
- Finished floor
- Door and frame prep
- Hardware set and templates
Occupied facilities and operational problems
Property management, multifamily, healthcare or senior living, retail or office, and warehouse or industrial sites can have different traffic, access, sequencing, and disruption constraints. Those examples describe context, not separate certifications or blanket specialization.
For a problem opening, identify the symptom and collect wide and close photos. A-1 distinguishes a confirmed physical adjustment or replacement need from electrical, locksmith, glass, or inspection work.
Hollow-metal doors, frames, and hardware
Door and frame condition should be evaluated separately. A damaged leaf, corroded or impacted frame, failed anchorage, preparation mismatch, clearance problem, and worn hardware do not share one correction.
A-1 coordinates the physical opening and installs within the assigned labor scope. Rated-opening, accessibility, egress, design, inspection, and acceptance responsibilities remain with the governing documents and qualified parties.
Greeley and Weld County jurisdiction checkpoint
A Greeley mailing address does not by itself establish the building authority. Projects inside the City and in unincorporated Weld County use different processes.
Confirm jurisdiction and the approved project requirements before relying on a permit, inspection, accessibility, egress, or rated-opening checklist.